The process plans for the handlebar assembly contain a single subassembly operation. In
this operation, the previously manufactured handlebars and neck posts are assembled. The
subassembly is then placed in inventory where it is available for demand from a final
assembly order. The component parts required for this subassembly are a handlebar and
neck post for each subassembly to be produced. The process plan for Handlebar Assembly
is summarized below.
Handlebar Assembly Plan
H
ANDLEBAR
The process plans for a handlebar contain three operations: cut, bend, and finish. The
completed handle is then placed in inventory to be used by orders for handlebar
assemblies. The raw materials required at the cut operation have not been included in the
process plan as the material-planning replenishment process at the MRP level assures that
Seq
#
Operation
Work
Cell
Setup
Time
Process
Time
Additional
Resources
Notes
10 Cut SHP Frame
Tubing
Cut 0.36 0.120
20 Bend SHP Frame
Tubing
Bend BM 0.154
30 Machine SHP
Frame Tubing
Machine MM 0.211
40 Weld SHP Frame Weld WD 0.234 Place in inventory
10
CUT FRAME
TUBING
20
BEND FRAME
TUBING
30
MACHINE
FRAME
TUBING
40
WELD
FRAME
Seq
#
Operation
Work Cell
Setup
Time
Process
Time
Additional
Resources
Notes
10 Assemble
Handlebar
Subassembly 0.21 0.072 Labor (1) Handlebar and Neck
Post required;
Place in inventory
10
ASSEMBLE
HANDLEBAR