FACTORYTALK METRICS LINE EDITION ADMINISTRATORS GUIDE
18
• • • • •
T
OTAL
P
ARTS
The Total Parts value is automatically calculated by FactoryTalk Metrics as:
Good Parts + Scrap Parts = Total Parts
The FactoryTalk Metrics LE Configuration Tool does not use Total Parts when
configuring performance parameters and relies on FactoryTalk Metrics to calculate Total
Parts as the sum of Good Parts and Scrap Parts. If the customers application requires that
Total Parts be collected, you must configure Total Parts manually using the RSBizWare
Configuration Console after you run the FactoryTalk Metrics LE Configuration Tool.
S
CHEDULED
A
VAILABILITY
By default, the FactoryTalk Metrics Configuration tool configures Scheduled Availability
to be collected from the control system. The UDT’s Shift tag is expected to contain a
number that corresponds to the workcell’s current shift number. If Shift is greater than
zero, the workcell is assumed to be on shift and available to run.
R
UNNING
Running is used to determine whether or not a workcell is running. If the Running tag is
high or true, the workcell is considered to be running. Running Time is an important
component of several KPI calculations.
Line UDT Field Name Data Type FactoryTalk Metrics use Scheduled/Unscheduled
6 Shift Integer Scheduled Availability -
Shift
Unscheduled
You can create a list to convert shift values to strings by using the Configuration Console. See
the FactoryTalk Metrics User’s Guide.
Line UDT Field Name Data Type FactoryTalk Metrics use Scheduled/Unscheduled
7 Running BOOL Running state indicator Unscheduled