
A
HOLD FLUSH
TO INSIDE
OF ENCLOSURE
MEASURE TO
INSIDE OF T
HE
TOP OF ENCLOSURE
TOP HANDLE H
OLE
BOTTOM HANDLE H
OLE
Disconnect Handle Installation
Disconnect Switch Installation (Right hand installation shown. For left hand installation follow similar procedure.)
1
2
Install gasket.
30-40 lb-in
Install handle and spring bracket.
Use template A to locate handle holes on mounting plate.
Overlay template B (30 A - 100 A) over A .
Overlay template C (200 A) over A .
7-11 lb-in
Install defeater lever.
Cutting Connecting Rod
N
Enclosure
Working Depth
(Inside Flange
of Enclosure to
Mounting Plate)
Mounting
Plate
Measure working depth of enclosure.
3
Measure, mark and
cut connecting rod.
N minus 3-1/8"
(30A - 100A)
N minus 3-1/4"
(200A)
23 - 37 lb-in
(30A - 100A)
40 - 60 lb-in
(200A)
TAPE
HOLD FLUSH
TO INSIDE
OF ENCLOSURE
MEASURE TO
INSIDE OF THE
TOP OF ENCL
OSURE
TOP
BOTT
2
4
A
11
5
1
1
2
Remove burrs
3
2 3
Install disconnect switch.
7
6
1
3
A
HOLD FLUSH
TO INSIDE
OF ENCLOSURE
MEASURE TO
INSIDE OF T
HE
TOP OF E
NCLOSURE
TOP
BOTT
B
or
C
2 - 1/4"
5 - 1/4"
2 - 1/4"
4 - 11/16"
3 - 1/16"
Switch Mounting Holes
Center punch and drill (4) 11/64" holes for
tap-tite screws provided with
switch
Center punch and
drill (4) holes
for thread forming
(TAP-TITE) screws
provided with switch.
11/64" Dia. (30A - 100A)
7/32" Dia (200A)
PN-47400
DIR 10000056505 (Version 00)
QUICK INSTALLATION GUIDE
(2)
6 - 3/4"
30A - 60A - 100A Disconnect Switches
“N”
Min.
6 - 3/4"
9 - 1/8"
Max.
21 - 5/8"
8 - 1/2"
200A Disconnect Switches
“N”
Min.
8 - 1/2"
10 - 1/4"
Max.
22 - 3/4"
1494V-RA3
1494V-RA4
Catalog
Number
Connecting
Rod
Standard
Extended
Komentáře k této Příručce